How long is a lease? 3 years? 4 years? My little Corsa has 95% capacity left after 3 years and 40000km.
60 amps, three phases that’s, what, 72kW at 400V - that’s more than enough. My cars charge at 11kW/3phases. I’ve got 63A service and I can charge both cars, run the heatpump, have the stove going and still have amps to spare.
You must not be familiar with North American power systems. I would bet the op had single phase service providing 220 or 240 volt service. 60 amp service is outdated, 100 amp is basically the minimum and 200 amp is common.
You must not be familiar with North American power systems.
I would bet the op had single phase service providing 220 or 240 volt service.
Oh, I see. Yeah, well, okay, that’s basically nothing. Seems like the country isn’t really on a good path for electrifying things, then. How do they use any large electric motors at home?
Living in the boonies - I could get 3 phase, 400V, 100A for 800€, that’s 120kW. Yes, we’re paying a lot per kWh but the grid quality is okay-ish.
You got it. I’m not really familiar with electrical stuff, but I kinda think my service is 110? My dryer and water heater are on separate 2 fuse circuits. I think it was upgraded from aluminum wire in the 70’s. I have the “good” paper wrapped wire now.
As another cool aside about my house, the sewer line was made of cardboard
The guy who replied is correct. My house was built in the 50’s it was upgraded from 30amp service and the aluminum wire was replaced with a “state of the art” 60amp fuse panel and paper wrapped wire at some point. Not that much of an upgrade. To use large motors at home you put a penny under the fuse /s. I also don’t have any space left in the panel so…
I misspoke saying lease, I meant finance. I like to keep things as long as possible.
How long is a lease? 3 years? 4 years? My little Corsa has 95% capacity left after 3 years and 40000km.
60 amps, three phases that’s, what, 72kW at 400V - that’s more than enough. My cars charge at 11kW/3phases. I’ve got 63A service and I can charge both cars, run the heatpump, have the stove going and still have amps to spare.
You must not be familiar with North American power systems. I would bet the op had single phase service providing 220 or 240 volt service. 60 amp service is outdated, 100 amp is basically the minimum and 200 amp is common.
Oh, I see. Yeah, well, okay, that’s basically nothing. Seems like the country isn’t really on a good path for electrifying things, then. How do they use any large electric motors at home?
Living in the boonies - I could get 3 phase, 400V, 100A for 800€, that’s 120kW. Yes, we’re paying a lot per kWh but the grid quality is okay-ish.
You got it. I’m not really familiar with electrical stuff, but I kinda think my service is 110? My dryer and water heater are on separate 2 fuse circuits. I think it was upgraded from aluminum wire in the 70’s. I have the “good” paper wrapped wire now.
As another cool aside about my house, the sewer line was made of cardboard
The guy who replied is correct. My house was built in the 50’s it was upgraded from 30amp service and the aluminum wire was replaced with a “state of the art” 60amp fuse panel and paper wrapped wire at some point. Not that much of an upgrade. To use large motors at home you put a penny under the fuse /s. I also don’t have any space left in the panel so…
I misspoke saying lease, I meant finance. I like to keep things as long as possible.