Those 800 wind turbines can be built in a month. Building a nuclear plant takes decades. And nuclear fuel reprocessing had never been economical by a long shot. Your pipe dreams will always regain just that and that’s before we even start talking about proliferation and nuclear waste.
Those 800 wind turbines can be built in a month. Building a nuclear plant takes decades. And nuclear fuel reprocessing had never been economical by a long shot. Your pipe dreams will always regain just that and that’s before we even start talking about proliferation and nuclear waste.
In China they do it in 6 years…
https://www.statista.com/statistics/712841/median-construction-time-for-reactors-since-1981/
And in those 6 years, you could have built over 6x that capacity in renewables, easy.
You can also built more than 1 reactor at the same time
The same can be said of any power source?
You could, but with that colossal amount of resources you could have built 12x in renewables, probably more because of economy of scale.
And if you decide to commit all those resources to renewables, you probably just created a booming local industry of well paying jobs.
I’m very glad I don’t live anywhere near one of those.
And why is that?
The Chinese are really famous for their safety culture, right?
None of their reactors have blown up yet and they’ve had nuclear plants since the 50’s