But my electric company has some dumbass arbitrary limit on the amount panels the professional installers have to follow and I’m pretty sure I’m close to it
This is what I faced too. The power company only allowed to install solar generation capacity 110% of my power consumption over the last 12 months. So we had to spent a year being very wasteful of electricity. That allowed me to put up panels covering the entire roof.